Project Name:Zhejiang ** Paper Group Co., Ltd. Thermal Power Plant

Project Introduction:

Project Status:

Thermal power plant of a Zhejiang Paper Group Co., Ltd.

A set of cooling circulating water system with a circulating capacity of 16000m3/h will be built as a supporting facility. The supplementary water quality of the system is river water near the power plant.

The main problems of the project: bacteria and algae reproduction, slime, poor water quality

Serial numberprojectSystem parameters
1
Circulating water volume (m3/h)

12000

2Water retention m36000
3System equipment materialCarbon steel, copper, stainless steel
4Types of water treatment chemicalsCorrosion and scale inhibitor, bactericidal algicide, slime stripper

Project operation control results: The system has been operating stably throughout the year, bacteria, algae and slime are basically controlled, and the terminal difference is stable at about 9°C