Project Name:Ningbo **Environmental Energy Co., Ltd.

Project Introduction:

Project situation: An Environmental Energy Co., Ltd. in Ningbo is a waste incineration power plant. It is equipped with a cooling circulating water system with a circulation of 16000m3/h. The supplementary water quality of the system is the river water near the power plant, and the leachate treats the produced water.


The main problems of the project: bacteria and algae reproduction, slime, poor water quality

Serial numberprojectSystem parameters
1
Circulating water volume (m3/h)

16000

2Water retention m33000
3System equipment materialCarbon steel, copper, stainless steel
4Types of water treatment chemicalsCorrosion and scale inhibitor, bactericidal algicide, slime stripper

Project operation control results: the system has been operating stably throughout the year, the bacteria, algae and slime are basically controlled, and the end difference is stable at about 8℃