Project Name:**Thermal Power Co., Ltd.

Project Introduction:

Project situation: A thermal power company is supporting a coal-fired power plant in the chemical park. It is equipped with a cooling circulating water system with a circulation volume of 500-1000m3/h. The supplementary water quality of the system is river water near the power plant.


The main problems of the project: bacteria and algae reproduction, slime, poor water quality

Serial numberProjectSystem parameters
1
Circulating water volume (m3/h)

500

2Water retention m3300
3System equipment materialCarbon steel, copper, stainless steel
4Types of water treatment chemicalsCorrosion and scale inhibitor, bactericidal algicide, slime stripper

Project operation control results: the system has been operating stably throughout the year, the bacteria, algae and slime are basically controlled, and the end difference is stable at about 8℃

image.png   

Before the problem is solved

image.png

After the problem is resolved

After the system has been flushed by the high-pressure water gun, the proprietor's regular and quantitative dosing has been attached to the column and tower side of the system throughout the year with sterile algae and slime.